- November 16, 2021
- Posted by: admin
- Category:
![](http://tcbsports.com.sg/wp-content/uploads/2021/11/9-TENNIS-COURTs-min.png)
![](http://tcbsports.com.sg/wp-content/uploads/2021/11/9-TENNIS-COURTs-min.png)
9 Tennis Courts at Dover Campus
The resurfacing of the tennis courts was completed in 2018. The Tennis Court is laid using Laykold Colorcoat System. Court 6 was designed to meet ITF 2 star requirements which takes into account of standard court dimensions, evenness of the court & the pace of the ball when it is being played. This is the first certified ITF 2 star court in Singapore!